Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the content-slider-block domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nccan/public_html/wp-includes/functions.php on line 6114
Niagara Hydrogen Centre - Niagara Climate Change Action Network

Atura Power selected the Niagara Region as their first Ontario site for commercial-scale hydrogen production. The Niagara Hydrogen Centre will also be Ontario’s largest green hydrogen production facility, with a hydrogen production capacity of 20 MW, utilizing proton exchange membrane electrolysis technology to split water into hydrogen and oxygen molecules using electricity delivered behind-the-meter from the Sir Adam Beck II Generating Station, with water sourced from the Niagara River.

Categories: Pathway to net-zero

Skip to content