Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the content-slider-block domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nccan/public_html/wp-includes/functions.php on line 6114
District Energy System Electrification Project - Niagara Climate Change Action Network

The District Energy System (DES) electrification project will significantly reduce Brock’s carbon emissions by diversifying campus heat sources and reducing the use of natural gas in the DES. Scheduled to be completed by March 2025, the project will include the installation of an electric boiler, refurbishing several existing electric boilers. and installing a heat pump. It also includes the recovery of waste heat from the Cairns steam boiler, the optimization of control sequences for DES and satellite assets, and piping retrofits for several buildings.

Categories: Pathway to net-zero

Skip to content