Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the content-slider-block domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nccan/public_html/wp-includes/functions.php on line 6114
High-Impact Retrofit and Recommissioning - Niagara Climate Change Action Network

Moving past the ‘low-hanging-fruits’ approach to energy retrofits, these projects are packaged to produce the highest-value for the lowest-cost investment. They include full-facility LED lighting and low-voltage controls retrofits, building BAS and controls system recommissioning, and plumbing isolation and monitoring improvements.

Categories: Pathway to net-zero

Skip to content