Over the past 7 years, a quarter of the 2-km break wall along the Niagara River in Fort Erie has been severely damaged through storm events. To increase the resiliency of this shoreline, through this pilot project, Niagara Parks Commission (NPC) will be working with a coastal engineer to design and implement alternative mitigation strategies for replacing the existing break wall and/or enhancing the existing shore-wall.

Skip to content