Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the content-slider-block domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nccan/public_html/wp-includes/functions.php on line 6114
Fort Erie Break Wall Restoration Project - Niagara Climate Change Action Network

Over the past 7 years, a quarter of the 2-km break wall along the Niagara River in Fort Erie has been severely damaged through storm events. To increase the resiliency of this shoreline, through this pilot project, Niagara Parks Commission (NPC) will be working with a coastal engineer to design and implement alternative mitigation strategies for replacing the existing break wall and/or enhancing the existing shore-wall.

Skip to content